Our Projects

Arizona Copper Triangle.

A world-class copper district with exceptional infrastructure and proven mining potential.

Arizona Copper Triangle

A world-class copper district with exceptional infrastructure and proven mining potential.

60miles

Strategic Location

Only 60 miles from Phoenix Airport, providing excellent accessibility and logistics.

37B lbs

Proven Production

The region has produced 37 billion lbs of copper to date and holds 95 billion lbs of known copper reserves and resources.

7majors

World-Class Neighbors

Direct neighbor of some of the world's largest copper producers including Asarco/Grupo Mexico, BHP, Capstone, Freeport McMoRan, KGHM, Rio Tinto, and South32.

Arizona Copper Triangle map showing the Copper Springs Project land package and the surrounding major mines

Copper Springs Project

Arizona, USAExploration

22,086 acres across 1,100 claims at the centre of the Globe-Miami district, permitted for Phase 1 drilling at 37 locations.

Location, Location, Location

60 milesfrom Phoenix Airport
World-ClassDistrict with proven reserves
PrimeInfrastructure & accessibility

Property Size

22,086 acres

1,100 BLM mining claims (89.4 km²), plus 223.85 acres of patented land at the Gibson Mine

Historical Resource

47M tons @ 0.4% Cu

(1) Non-43-101 compliant historical resource

Infrastructure

All infrastructure available with multiple nearby mines in operation. Direct access on Forest Land Road from Highway 60.

Water Resources

Natural occurring springs exist on the property. Water permits will need to be obtained for usage with no competing uses in the area.

(1) The 47M tons @ 0.4% Cu estimate (NI 43-101 Technical Report, Feinstein, 2022) is historical in nature and does not conform to current NI 43-101 standards. It is considered relevant and reliable for reference purposes but should not be treated as a current mineral resource.

Project Location Detail

Copper Springs is surrounded by Capstone’s Pinto Valley, Freeport-McMoRan’s Miami-Inspiration, KGHM’s Carlota, Rio Tinto and BHP’s Resolution and the South32 extension of the Copper Springs Project.

Map of the Copper Springs Project land package, including the Gibson Mine, with neighbouring mines and project boundaries

Gibson Mine

The historic Gibson Mine.

Coyote Copper purchased the historic Gibson Mine on November 3, 2026. The mine sits on 223.85 acres of patented land made up of three patented mining claims.

Past production
17.2 million lbs of copper recovered from 55,750 short tons of ore, 1903 to 1969
Shipments
In June 1907, approximately 80 tons per day shipped to Old Dominion at over 25% Cu
Underground workings
Six levels and about 26,000 ft (7.9 km) of workings. On Level 4 of the Pasquale Vein, five stopes supplied ore shipments assaying 16 to 18% Cu in 1912
Historical resource
39 million tons at 0.4% Cu (343 million lbs of copper)*

*An in-situ estimate in the USGS MRDS record (#10104088), taken from the K.R. Long 1995 compilation of porphyry copper deposits. These estimates are historical in nature, not compliant with NI 43-101, and should not be treated as current mineral resources.

Map of the Gibson Mine underground workings showing six levels, the main vertical shaft, inclined shafts and the Pasquale Adit
Gibson Mine underground workings. Map by MineOro Explorations, September 2026.

The Globe-Miami district

Surrounded by the world’s largest copper producers.

Copper Springs sits in the centre of the Superior-Globe-Miami district, covering several kilometres of the margin of the Schultz Granite, the same setting as the deposits around it.

Satellite map of the Copper Springs Project land package, including the Gibson Mine, and the neighbouring mines of the Globe-Miami district
Locations approximate

Neighbouring resource figures are 2022 totals reported by their operators, as summarized in the Company’s May 2026 presentation. Coyote Copper has not verified them and they are not necessarily indicative of mineralization at Copper Springs.

Geology

The third porphyry system in a district of mines.

The Globe-Miami district comprises three rotated and dismembered porphyry centres. Two of them host operating mines at Pinto Valley and Miami-Inspiration. The third, the Copper Springs System, runs right through the Copper Springs property.

Current geophysical and geochemical data outline a 3 km by 3 km by 1.4 km subsurface anomaly, interpreted as a large intrusive-hydrothermal centre consistent with a porphyry copper system. Surface and near-surface sampling has returned copper values up to 1,000 ppm.

Geological map of the Globe-Miami district showing the Pinto Valley, Miami-Inspiration and Copper Springs systems
Copper trends of the Globe-Miami district. Source: Maher, 2008 and Briggs, 2022. Select the map to view it full size.

Copper Springs Project

The third porphyry system runs right through the property.

The Globe-Miami district is made up of three rotated and dismembered porphyry centres. Two of them host operating mines at Pinto Valley and Miami-Inspiration. The third, the Copper Springs System, crosses the heart of the Copper Springs claims.

See the exploration program
Azurite at the entrance to a 300 foot adit, beside planned drill hole CS15
Copper Springs SystemAzurite at the entrance to a 300 foot adit, beside planned drill hole CS15
Malachite sampled near planned drill hole CS3 at Gibson
Gibson BlockMalachite sampled near planned drill hole CS3 at Gibson
Birthday Zone hillside on the east side of the project
Birthday ZoneBirthday Zone hillside on the east side of the project
Breccia pipe terrain, west side of Copper Springs
Breccia PipesBreccia pipe terrain, west side of Copper Springs
Relogged historic drill core with chalcopyrite
Historic CoreRelogged historic drill core with chalcopyrite

Exploration

Drilling Program

Coyote Copper Mines has received its Phase 1 drill permits for 37 drill locations and signed a drilling contract. Drilling is scheduled to start on November 16, 2026.

Drill roads and pads are being built and all necessary permits are in hand. Each approved location can host multiple drill holes, and the campaign will test both shallow oxide and deeper sulphide copper targets.

Read the October 16 release
Copper Springs Project drilling pad locations and road access map showing planned drill sites
Copper Springs drill pad locations and road access.
Approved

Phase 1 drill permits

Plan of Operations approved for 37 drill locations, each able to host multiple holes, with three years to complete drilling and reclamation.

Underway

Soil geochemistry

3,667 soil samples collected and 2,437 assayed, with a further 1,341 mapped soils awaiting assays. Surface and near-surface sampling has returned copper values up to 1,000 ppm.

Complete

Geophysical interpretation

635 line-kilometres of drone magnetics over 100 lines, with soils and IP inversions, outline a 6 km wide circular “Donut” chargeability feature at depth.

Underway

Induced polarization

A 2D IP grid of 15 lines and 48.3 line-kilometres from 1,947 GPS stations. The east side is complete and the west is underway.

Underway

CSEM-MT and SIP survey

The February 2026 survey is complete. Zonge is extending it: as of October 22, 25 stations were delivered and 63 were in processing.

In progress

Mapping and channel sampling

454 rock and 399 channel samples collected, including 396 metres of channel sampling, with 3,614 structural measurements mapped across the project.

Maps and figures.

Select a figure to view it full size.